Home | About Us | Companies | Equipment | Jobs | CV list | Recruiter login | receive jobs | News | Agenda | Blog
e-mail address:
password:
 
  new account
  forget your password?
September 2010
S
M
T
W
T
F
S
     
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
   
Company:
Epsco S.r.l.
 
Job title:
Senior Engineer Manager - Italy (CAG)
Department:
Other
Country:
Italy
City:
Milano
Job type:
full time
Level carier:
Some college 4-year Degree
Candidat ideal:

Responsabilitati:
Type of work Engineering /Construction of new Oil & Gas Plant located in EAU

The new gas processing complex is a grass-root facility. The site will be leveled as part of an early works site preparation contract and the installation of the main access road. The site is approximately 4.0 km2 and located between existing oil wells.

There are four EPC contract packages associated to the work which are as follows:

• Early Works EPC contract
• Non-Process Buildings EPC contract
• Utilities and Offsites EPC contract
• Process Plant EPC contract

The Process plant EPC package scope of work consists of a turnkey project for the engineering, supply, installation, commissioning and handover of the following process units and facilities:

• Unit for Feed Gas compression
• Unit for Condensate stabilisation
• Units for Rich Gas Acid Gas Removal
• Units for Lean Gas Acid Gas Removal
• Units for Rich Gas Dehydration, Mercury Removal and NGL Recovery
• Units forLean Gas Dehydration, Mercury Removal and NGL Recovery
• Units for Sulphur Recovery and Tail Gas Treating Units
• Unit for Fuel Gas system
• Unit for Acid, Cold and hydrocarbon Flares
• Unit for Sour Water Stripper

Scope shall include the following:

• Process equipment, and piping within the Process units up to Utilities battery limits.
• All piperacks within Unit limits and within Process EPC up to Utilities units battery limits
• All foundations and steelwork within Process plant EPC package area
• All undergrounds within Process plant EPC package area
• All roads within Process Plant EPC package area
• All fencing within Process Plant EPC package area
• All buildings within Process Plant Units only including sub-stations, switchrooms, IES’s, equipment shelters, operator facilities, satellite workshops etc
• Utilities within Process plant EPC package area
• Electrical scope includes Main Sub-station and any downstream electrical equipment including bulks will be supplied and installed
• Instrumentation scope includes IES and any downstream instrumentation / equipment including bulks shall be supplied and installed




Describe Job:
Requirements:

B.S. or equivalent degree in Engineering (Mechanical or Chemical) from an accredited university with minimum fifteen (15) years relevant experience in the oil/gas industry. Must have been in CONSULTANT’s organisation for at least five (5) years in similar position. An advanced degree in Engineering Management and/or training or experience in Project Management is desirable.

Requires demonstrated ability to manage engineering effort for major projects in major oil and gas companies in-house or as part of Consultant’s team.


Skill : Strong communication and team leadership
Ability to work under pressure and manage multiple tasks simultaneously
Able to communicate in English language



Slary:
Duration
12 months renewable
Valabilitate:
from: 1-6-2010 to: 1-6-2011
   
 
 
Department
keywords
 
Category
keywords
Copyright © 2006 Oilgas. All rights reserved.
Home | Companies | Equipment | Jobs | CV list | Recruiter login | Blog | News | Agenda | Contact | TERMS OF USE
eXTReMe Tracker